Civil construction , Building
Chemical products warehouse
Brugués
Construction of a 3,200 m2 chemical products warehouse with a tanker loading area (715 m2) and a corporate office building (655 m2).
Built with deep foundations and a prefabricated concrete structure.
The perimeter enclosures are built with prefabricated concrete, the roof with sandwich panels and the dividing partitions are prefabricated concrete panels with strong fire resistance.
Owner
Brugués
Sector
Chemical
Location
Viladecans, Barcelona
picture gallery
CONTACT US
If you would like us to study your project and prepare a proposal, or if you have any other questions, please use the form below to contact us. We’ll be happy to help.
OTHER SIMILAR PROJECTS

Heavy materials warehouse
Private
La Selva del Camp, Tarragona
Construction of a 3,000 m² heavy materials warehouse equipped with a loading area and changing rooms. Built using superficial foundations and a ...

Raw materials warehouse
Miavit
La Canonja, Tarragona
Construction of a 1,100 m² warehouse for raw materials equipped with a changing room and a canteen ...
Customers
Here you’ll find some of the customers we work for
